We’re now about 3/4 of the way through. 1st pic is from the second or third day of demo (10th or 11th), 2nd pic is after they put in the floor and cabinets with a temporary sink (13th). 3rd pic is from yesterday – island is in and we did some painting to the trim and windows. Countertop should be in at the end of the week. After they install, the gas range will be connected and they’ll do the backsplash tile.
4 Comments
leave one →
Very cool use of space! Love the sink on that side of the room 🙂
Thanks! We like it there too. It was the designer’s idea to move it there and re-work the wall facing the deck. Thankfully there was plumbing already on the wall we moved it to, so not much of a stretch to get it hooked up.
Looks AWESOME! Bet you can’t wait to have your kitchen back (better than ever!)
It’s getting there. Things are better since they hooked up a sink for us and took a break until the countertop arrives. It was a lot of squalor up to then.