Skip to content

Kitchen Renovation Phases 1 and 2

January 27, 2014

We’re now about 3/4 of the way through.  1st pic is from the second or third day of demo (10th or 11th), 2nd pic is  after they put in the floor and cabinets with a temporary sink (13th).  3rd pic is from yesterday – island is in and we did some painting to the trim and windows.  Countertop should be in at the end of the week.  After they install, the gas range will be connected and they’ll do the backsplash tile.

Cleared Space

Cabinets InKitchen 01262014

Advertisement
4 Comments leave one →
  1. kim permalink
    January 27, 2014 2:41 PM

    Very cool use of space! Love the sink on that side of the room 🙂

  2. Kevin permalink*
    January 27, 2014 3:00 PM

    Thanks! We like it there too. It was the designer’s idea to move it there and re-work the wall facing the deck. Thankfully there was plumbing already on the wall we moved it to, so not much of a stretch to get it hooked up.

  3. Alana permalink
    January 27, 2014 3:53 PM

    Looks AWESOME! Bet you can’t wait to have your kitchen back (better than ever!)

  4. Kevin permalink*
    January 28, 2014 2:27 PM

    It’s getting there. Things are better since they hooked up a sink for us and took a break until the countertop arrives. It was a lot of squalor up to then.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: